Collaborative disruption planning for major infrastructure projects.
Project teams and clients use Mappt to plan disruptions, track closures, and stay aligned.
Built for both sides of
disruption management
The tool that finally gives project teams and network operators a shared language.
Single source of truth
Project teams log disruptions. Network ops see the impact. Everyone works from the same live register — no more chasing spreadsheets between organisations.
AI-powered intelligence
Automated clash detection, with a conversational assistant that understands the full program — from both the delivery and network perspective.
Shared visibility, separate control
Project teams manage their disruptions. Network operators see the cumulative corridor impact. Both sides stay aligned without stepping on each other's workflows.
Every disruption. Searchable. Filterable. Always current.
A powerful, spreadsheet-killing table of every planned disruption across your program. Filter by corridor, work package, impact level, status, or date range. Inline editing, full change history, and one-click Excel export.
See your entire program on one timeline
A custom-built Gantt chart grouped by corridor with disruption bars colour-coded by impact. Public holidays, school holidays, and blackout periods are overlaid so you can spot scheduling conflicts at a glance. Zoom from week to year.
Find clashes before they find you
Mappt automatically detects disruptions sharing the same corridor, detour route, or location with overlapping dates. Each clash surfaces both disruptions, the reason, and the overlap window. One-click AI assessment generates a mitigation brief instantly.
Ask your assistant anything
A conversational AI assistant with full context of your disruptions, clashes, blackout periods, and uploaded documents. Ask questions like "What clashes are active this month?", "Summarise Eastern Freeway disruptions", or "Which packages have the most upcoming work windows?"
Map every detour. Detect every spatial conflict.
Draw and manage detour routes on an interactive map view. Each disruption can have named routes that feed directly into the clash detection engine — so spatial conflicts are caught automatically, not manually.
Connect projects. Coordinate programs.
Mappt isn't just for one project — it's the connective tissue across your entire program. Link projects, share visibility, and manage change across every team from one place.
Connect projects together
Link related projects so their disruptions, corridors, and timelines are visible across teams. Spot conflicts between separate contracts sharing the same network.
Program-wide visibility for clients
Clients and network operators can request access to multiple projects simultaneously — seeing the full program picture to co-ordinate, prioritise, and approve work windows across contracts.
Request, review, approve
Contractors submit new disruptions and change requests directly in Mappt. Clients review the details, assess network impact, and approve or reject — with a full audit trail of every decision.
One platform. Every project. Every stakeholder.
Whether you're running one project or coordinating across an entire program, Mappt scales with your team — giving clients oversight and contractors accountability in one shared system.
Everything your program needs
The complete platform — from executive overview to document library.
Program Overview
Executive summary dashboard with live KPI tiles, corridor breakdowns, and real-time work window tracking.
Key Dates & Calendar
Manage public holidays, school holidays, RDOs, weekend windows, and custom blackout periods. Feeds directly into the Gantt and Clash Detection.
Document Library
Upload and organise TIS files, modelling memos, ALT papers, WTMPs, and briefings. Full-text extraction powers the AI assistant.
TIS Import
Bulk-import disruptions from Traffic Impact Schedule Excel files. Auto-creates, updates, and flags deletions with a detailed results summary.
Plus: Saved Views system — save, name, and switch between custom filter configurations across the Register and Timeline. Your views persist across sessions.
One platform. Two perspectives.
Mappt connects the teams creating disruptions with the teams managing the network — so everyone works from the same picture.
For Project Delivery Teams
You're planning and delivering the work. Mappt gives you the tools to manage every disruption, route, and clash from your side of the fence.
Traffic & Disruption Managers
Own your disruption register. Log closures, assign impact levels, draw detour routes, and track every change — all in one place instead of spreadsheets.
Project Engineers & Corridor Coordinators
See your corridor on a timeline. Spot clashes with other packages before they become site conflicts. Manage blackout periods and holiday windows.
Document Controllers
Upload TIS files, modelling memos, and briefings into a structured library. Bulk-import disruptions from Excel with one click.
For Network Operations & Client Teams
You're responsible for road network performance. Mappt gives you oversight of every planned disruption across the program — without relying on email updates.
Network Operations Managers
See every active and upcoming disruption across all corridors in real time. Understand cumulative impact before approving work windows.
Program Directors & Executive Stakeholders
Get the program pulse at a glance — total disruptions, active today, clashes detected, and upcoming risks — without opening a single spreadsheet.
Client-Side Traffic Engineers